August 28, 2025 The Best Source of News, Culture, Lifestyle for Culver City, Mar Vista, Del Rey, Palms and West Los Angeles

Culver City Planning Commission Approves 30,000 Square-Foot Office Development

3570 National Boulevard development calls for 30,000 square feet of office space and 5,000 square feet of retail

By Dolores Quintana

The Culver City Planning Commission unanimously approved the proposed project from Redcar Properties at 3570 National Boulevard on December 14 as reported by Urbanize Los Angeles. The Planning Commission did ask for revisions to the plan before they voted to approve it. The developer agreed to establish ADA-compliant curb ramps at the southeast corner of the building at the Shaefer and National intersection and at the southwest corner of Shaefer and National “to the extent feasible using commercially reasonable efforts” and establish a crosswalk across Shaefer Street at National that would connect the two ramps.

The commission also clarified that “all new utility lines fronting the site shall be undergrounded by the applicant as revised.” Their staff recommended approval with a recommended setback revision, a Class 32 Categorical Exception, approving site plan review, administrative modification and administrative use permit, subject, of course, to the proposed conditions of approval and standard code requirements. 

The site is an oddly shaped area that formerly had a rail spur next to it. The proposed structure is three stories with 5,000 square feet of commercial space on the first floor underneath 30,000 square feet of office space. An underground parking structure will hold 91 vehicles per the proposed plans. 

The designer of record is Olson Kundig and according to Urbanize Los Angeles, the renderings show “a contemporary low-rise structure clad in concrete and metal panels. A site plan shows that a sliver of the property adjacent to the historic rail hub would be retained as an open area for tenants, as well as a space for outdoor dining for a potential ground floor restaurant.” The building would have a rooftop amenity deck. 

According to the staff report from the Culver City Planning Commission, the estimated time that it will take to complete the construction is about 19 months.

Related Posts

(Video) The Opening of Mr. Charlie’s with Santa Monica Mayor Lana Negrete

August 28, 2025

August 28, 2025

Vegan burger restaurant with brightly colored decor now open on 26th street across fromthe Brentwood Country Mart. The Opening of...

California Pizza Kitchen Debuts Heart-Shaped Pizza Celebrating Swift–Kelce

August 28, 2025

August 28, 2025

13 Days of Engagement Pizzas, and Return of Hot Honey Flavors California Pizza Kitchen is rolling out a series of...

Culver Hotel Celebrates 101 Years With 101 Anniversary Menu and Live Music

August 28, 2025

August 28, 2025

Guests Can Enjoy a Four-Course Meal, Nightly Performances, Trivia Contest The historic Culver Hotel is celebrating its 101st anniversary this...

Westside Chefs Shine at the Manhattan Beach Food & Wine Festival in September

August 27, 2025

August 27, 2025

South Bay’s Culinary Festival Returns With Two Nights of Food, Wine, and Music Santa Monica, Westchester, Los Angeles, and West...

(Video) Come Tour The Willows Community School!

August 27, 2025

August 27, 2025

Sign up for a tour at The Willows and come see what makes our school such a vibrant, inspiring place...

Border Patrol Operation at Playa Vista Home Depot Causes Anger, Arrests

August 27, 2025

August 27, 2025

Witnesses Say Agents Clashed With Bystanders as Two People Were Detained Chaos erupted outside Home Depot on Jefferson Avenue in...

Metro LA’s Aug. 30 Deadline for Public Comment on Sepulveda Transit Draft EIR Approaches

August 27, 2025

August 27, 2025

Community Members Can Weigh In Before the 90-Day Comment Period Closes. Metro is reminding community members that the 90-day public...

Culver City, Beverly Hills, Brentwood, and Uni High Gear Up for Early-Season Games

August 26, 2025

August 26, 2025

The Centaurs, Eagles, Normans, and Wildcats Face Key Matchups This Week Football season is heating up across our area, with...

I-405 to See Lane Reductions, Ramp Closures as Pavement Rehab Project Continues

August 26, 2025

August 26, 2025

Drivers Should Expect Delays With Overnight Work Aug. 26–28, Sept. 5 Motorists using Interstate 405 through the Sepulveda Pass should...

Kobe Day Tribute: Lakers Welcome UCLA Newborns With Purple-and-Gold Gifts

August 26, 2025

August 26, 2025

Babies Received Adorable Care Packages in Celebration of “Kobe Day.” Families welcoming newborns at UCLA Santa Monica Medical Center and...

Suspect Arrested After Eight-Hour SWAT Standoff in Jefferson Park Shooting

August 26, 2025

August 26, 2025

 Police Say a Man Was Killed and a Suspect Barricaded Himself Inside a Home Hours after a fatal shooting near...

Attorney General Rob Bonta Secures Release of $900M in Frozen Education Funds for California

August 25, 2025

August 25, 2025

Trump Administration Agrees to Release Frozen Education Funds  California Attorney General Rob Bonta announced Friday that the Trump administration has...

“Rich Rollin” Burglary Crew Linked to 92 Break-Ins Taken Down in LAPD Operation

August 25, 2025

August 25, 2025

Ten Suspects, Including Confirmed Gang Members, Face Charges Nearly 100 residential burglaries across the city have been tied to a...

Sawtelle Neighborhood Could See Seven New Small-Lot Homes Under SB 684

August 25, 2025

August 25, 2025

Plans Filed Call for Replacing a Single-Family Residence With Two-Story Homes A proposed housing development could build seven small-lot homes...

18-Year-Old Woman Fatally Shot While Trying to Break Up a Fight on a Metro Bus

August 24, 2025

August 24, 2025

Police Say the Teen Was Killed in Westchester After Intervening in a Dispute  Efforts to break up a fight on...